Kaleidoscoptic

Tuesday, September 25, 2007

Almost Finished


Finally, the baby shower. The blanket and bibs I made were a hit.
I’ve actually been knitting all this time, but I haven’t blogged because I don’t have much to show for it. All this time I’ve been working on the Tilted Duster. I can’t understand how some people finish it so quickly. I only have to sew in one more sleeve and then I’ll be finished, so maybe tonight. I didn’t like how the collar looked on me. It was too high and bothered my neck. So I frogged it and left off the button holes and plan to join it with one button and a loop at the bust. I like to wear sweaters open anyway and this will give me more options. I really like it. The yarn is soft and it was fun to make. I guess I like to knit ribbing, although I know a lot do not. Today I started the Cobblestone Pullover for my son. I haven’t gotten too far but I am not that happy with the yarn. Classic Elite Skye Tweed is just not as soft as Peruvia, and I’ve been spoiled. I’ll finish it though. If he doesn’t like it, someone will.

0 Comments:

Post a Comment

<< Home